Webscreeded base (measurement unit in m2). (iii) 19mm thick cement and sand (1:3) screeded bed to receive anti-slip ceramic tiles to floor level or to, vertical drop 50mm high on concrete base (measurement unit in m). (iv) Approved anti-slip ceramic tiles, bedded in cement and sand (1:3) mortar and pointed in white or coloured cement to, WebMay 3, 2024 · The screed is drawn toward the workers with a sawing, scraping motion that simultaneously smooths the surface and pushes …
(PDF) ENVIRONMENTAL SAFEGUARD ASSESSMENT
Web13 mm thk C & S (1:3) screeded backing to receive vertical ceramic skirting 100 mm high to wall on brickwall base & 13 mm high x 100 mm high approved vertical ceramic skirting, as described (a.d)., bedded & jointed in C&S (1:3) mortar & pointed in white cement to wall on screeding backing. 9.32 Maid room. WebD 15mm screeded backing on walls to receive glazed 115 m2 650 74,750.00 wall tiles in toilet areas. Tile, Slab and Block Finishings 10mm thick approved high quality non-slip vitrified ceramic floor tiles in cement and sand (1:3) screeded bed (measured separately) including pointing and jointing in white cement. maytag neptune washer model mah8700aww
SHONIBARE PROJECT 5 FLOORS Revised spec Blank BOQ
WebMay 26, 2024 · Plastering / Finishing Stage. Painting Stage Cost of Foundation (German Floor) This is the first stage of construction and it includes setting out, digging, concrete work, block laying, backfilling, and flooring as the processes in this stage. Material Requirements For Earthwork And Excavation Site clearance Labour only (238 sqm) = NGN … WebDec 21, 2024 · A Cement Fibre Tile Backing Board suitable for all tile finishes including the heaviest of natural stone. Used for over boarding chipboard, concrete, plywood, and other … WebThis is the first stage of construction and it includes setting out, digging, concrete work, block laying, backfilling, and flooring as the processes in this stage. Material Requirements For Earthwork And Excavation Site clearance Labour only (150 sqm) @ NGN 100 per m2 = NGN 15,000 Topsoil removal labour only (150 sqm) @ NGN 500 per m2 = NGN 75,000 maytag neptune washer motor repurpose